Application of Acrel Smart Control Device in Shang
0.Background
October 17th, 2018, Shanghai Lin-Gang management committee confirmed the Tesla (Shanghai) Co., LTD has successfully won the land mass Q01-05 l, 864885 m² of industrial land. On January 7th, 2019, first step construction of Tesla factory was announced at the intersection of LiangGang West Avenue and ZhengJia Road, located in the southeast corner of Shanghai. The plant is scheduled to have an annual capacity of 250, 000 electric vehicles at the first step, including models such as the Model 3. In March 2019, the first step of Tesla factory construction was finalized as Shanghai Construction Engineering Group, a local construction company in Shanghai. The Shanghai factory is Tesla's another factory besides the United States and will start construction in January 2019.
1.Overview
This project is the second step of Tesla's Shanghai Lingang Factory. This project includes 3 distribution rooms, including energy center C2, union workshop 4 and substation incoming isolation cabinets, with totally 60 sets of 10kV high voltage cabinets.
2.Product Solution
2.1Product requirements
For the project of Tesla Shanghai Lingang factory, smart control device is required to monitor the state of all high-voltage cabinets in the power distribution cabinet in the distribution room. The requirements of the project are as follows:
1) A dynamic simulation diagram, electrical display and blocking;
2) Temperature and humidity control, LED display;
3) Switch on and off, energy storage, remote/local switch;
4) Voice prompt and human body induction;
5) Lighting operation in the cabinet;
RS485/ Modbus communication.
In order to meet the above requirements, we choose ASD200 smart control device. The external structure of Acrel ASD200 intelligent control device is as follows:
2.2Project solution
For the 3 distribution rooms of the project, including energy center C2, joint workshop 4 and substation incoming isolation cabinets, there are totally 60 sets 10kV high voltage cabinets. Taking part of 10kV high voltage distribution cabinets as example, the products smart control device are shown in the figure below:
2.3Product detail
The smart control device ASD200 is used in this Tesla project, totaling 60 pcs. The product introduction is shown in the table below.
3.Other Related Products
For large production enterprise power distribution project, in order to provide the safety and reliability of power supply, Acrel also launched the switchgear electrical connection point temperature monitoring products, you can real-time monitor copper platoon, cable, contained in the circuit breaker plum touch the top temperature of the electrical connection, convenient operation maintenance of the entire transformer room. The following is the selection scheme of electrical node temperature measurement products of switch cabinet.
4.Summary
This article introduces the application of Acrel smart control products in project of Tesla Shanghai Lingang factory, aiming at the integrated measurement and control in the high-voltage switch cabinet, and the device is widely used in power plant, power system distribution network, factory and construction and other fields. Smart control device can replace live display instrument, temperature and humidity controller, switch position signal lamp, control switch (button), analog plate and electrical measuring instrument and other traditional secondary components, so that the switch cabinet disk clean, beautiful, easy to debug and maintain, to achieve operation and display in one.
相關(guān)產(chǎn)品
免責(zé)聲明
- 凡本網(wǎng)注明“來(lái)源:化工儀器網(wǎng)”的所有作品,均為浙江興旺寶明通網(wǎng)絡(luò)有限公司-化工儀器網(wǎng)合法擁有版權(quán)或有權(quán)使用的作品,未經(jīng)本網(wǎng)授權(quán)不得轉(zhuǎn)載、摘編或利用其它方式使用上述作品。已經(jīng)本網(wǎng)授權(quán)使用作品的,應(yīng)在授權(quán)范圍內(nèi)使用,并注明“來(lái)源:化工儀器網(wǎng)”。違反上述聲明者,本網(wǎng)將追究其相關(guān)法律責(zé)任。
- 本網(wǎng)轉(zhuǎn)載并注明自其他來(lái)源(非化工儀器網(wǎng))的作品,目的在于傳遞更多信息,并不代表本網(wǎng)贊同其觀點(diǎn)和對(duì)其真實(shí)性負(fù)責(zé),不承擔(dān)此類作品侵權(quán)行為的直接責(zé)任及連帶責(zé)任。其他媒體、網(wǎng)站或個(gè)人從本網(wǎng)轉(zhuǎn)載時(shí),必須保留本網(wǎng)注明的作品第一來(lái)源,并自負(fù)版權(quán)等法律責(zé)任。
- 如涉及作品內(nèi)容、版權(quán)等問(wèn)題,請(qǐng)?jiān)谧髌钒l(fā)表之日起一周內(nèi)與本網(wǎng)聯(lián)系,否則視為放棄相關(guān)權(quán)利。